Berkwood Completes Phase 3 Definition Drilling at Lac Gueret South, QC

March 16th, 2018, VANCOUVER, B.C. Berkwood Resources Ltd. (TSX-V: BKR, FSE: BK2, WKN: A110N3) (“Berkwood” or the “Company”) is pleased to announce that it has successfully completed its 9-hole Phase 3 definition drilling program on Zone 1 at the Company’s 100% owned Lac Gueret South Project (refer NR of March 5th). The Program was designed […]

Berkwood Completes Phase 3 Definition Drilling at Lac Gueret South, QC Read More »

Berkwood Announces Large Graphite Flake Charactization Results at Lac Gueret Project, Quebec

March 8 2018 / TheNewswire / VANCOUVER, B.C.   Berkwood Resources Ltd. (BKR) (wkn:A110N3) (“Berkwood” or the “Company”) is pleased to announce positive preliminary characterization results of graphite composite samples from its wholly owned Lac Gueret South property in northeastern Quebec. Results show that a large portion of the graphite flakes are coarse large flake (20

Berkwood Announces Large Graphite Flake Charactization Results at Lac Gueret Project, Quebec Read More »

Berkwood Resumes Resource Expansion And Definition Drilling At Lac Gueret South, QC

March 5th, 2018, VANCOUVER, B.C. Berkwood Resources Ltd. (TSX-V: BKR, FSE: BK2, WKN: A110N3) (“Berkwood” or the “Company”) is pleased to announce the immediate resumption of resource expansion and definition drilling on Zone 1 at the Company’s 100% owned Lac Gueret Project. The Phase 3 program is currently underway and includes a planned 1,500m of

Berkwood Resumes Resource Expansion And Definition Drilling At Lac Gueret South, QC Read More »

Berkwood Increases Landholding At Lac Gueret Project

February 27, 2018 -VANCOUVER, B.C. Berkwood Resources Ltd. (BKR)(wkn:A110N3) (“Berkwood” or the “Company”) is pleased to announce a significant increase in landholding at the Company’s 100% owned Lac Gueret Project through the acquisition of 1137794 B.C. Ltd., a private BC company,   The acquisition is an arm’s-length transaction in which the Company will issue 2,800,000 common

Berkwood Increases Landholding At Lac Gueret Project Read More »

Berkwood reports continued high grade Graphite assays with large true thickness intersections up to 71.1 m on the Phase 2 drill program on Zone 1 Graphite Body, and world class grades of up to 37.68% over 27.11m

February 21st, 2018, VANCOUVER, B.C. Berkwood Resources Ltd. (TSX-V: BKR, FSE: BR2, WKN: A110N3) (“Berkwood” or the “Company”) is pleased to announce the assay results from the Phase 2 drilling program on the Zone 1 Graphite Body at the Company’s 100% owned Lac Gueret South Project. Five HQ diamond drill holes were drilled in this

Berkwood reports continued high grade Graphite assays with large true thickness intersections up to 71.1 m on the Phase 2 drill program on Zone 1 Graphite Body, and world class grades of up to 37.68% over 27.11m Read More »

Berkwood Resources Announces Non-Brokered Private Placement

NOT FOR DISTRIBUTION TO U.S. NEWSWIRE SERVICES OR FOR RELEASE, PUBLICATION, DISTRIBUTION OR DISSEMINATION DIRECTLY, OR INDIRECTLY, IN WHOLE OR IN PART, IN OR INTO THE UNITED STATES. Berkwood Resources Ltd. (“Berkwood”) (TSX-V:  BKR) proposes to issue up to 5,000,000 units at $0.30 per unit for gross proceeds of up to $1,500,000.  Each unit will

Berkwood Resources Announces Non-Brokered Private Placement Read More »

Berkwood Plans UAV Drone Survey on Cobalt Ford Project

January 16th, 2018, VANCOUVER, B.C. Berkwood Resources Ltd. (TSX-V: BKR, FSE: BK2, WKN: A110N3) (“Berkwood” or the “Company”) is pleased to announce it is designing an exploration program on its wholly owned Cobalt Ford Property (the “Property”) located approximately 180 km northwest of Baie Comeau, Quebec. The Company has conducted a preliminary review of historic

Berkwood Plans UAV Drone Survey on Cobalt Ford Project Read More »

Berkwood Drills Massive Graphite Intercept on Zone 1, at Lac Gueret South

December 8th, 2017, VANCOUVER, B.C. Berkwood Resources Ltd. (TSX-V: BKR, FSE: BK2, WKN: A110N3) (“Berkwood” or the “Company”) is pleased to announce that it has completed the first hole of the Phase 2 drill program on Berkwood’s Zone 1 Graphite Body.    Management is very pleased to report that the Company has drilled a massive Graphite

Berkwood Drills Massive Graphite Intercept on Zone 1, at Lac Gueret South Read More »